Overview
Your products and security work at a glance.
- 01 · ProductsProducts
- 3
- 02 · Open vulnerabilitiesFindings
- 4
- 03 · Actively exploitedExploited
- 1
- 04 · Open Art. 14 casesArt. 14
- 1
What needs you now4 open
View all- UrgentActive exploitation: authentication bypass on NW-200 local web interfaceArticle 14 · Notification · Demo--:--:--due Nov 26
- ImportantCritical open findingVulnerabilities · Demo1 critical4 open
- ImportantA complete current scan is missingScan coverage · DemoNeeds review
- OpenConfirm whether the CRA appliesProduct scope · DemoNeeds review
Products3 of 5
View allAutomatic checks · Recent activityAutomatic checks · Recent activity
Automatic checks
See which checks actually ran and where a complete, current comparison is still missing.
Planned interval: 24 hours
Automatic checks and this view require active, paid access.
These checks are not a conformity certificate and do not replace evaluation of your product and its evidence.
Recent activity
No activity yet.
Deadlines and notesHide deadlines and notes
Deadlines
Reporting duty: In force — Article 14 applies since 11 Sep 2026 · 75 days ago.
Full application: 11 Dec 2027 · 382 days.
How readiness is scored
Weighted checks on how complete each record is, scored out of 100 — an aid computed from your own inputs, not a conformity assessment.
1 product on a route that can require a notified body
Member States have been able to notify conformity assessment bodies since 11 Jun 2026, when Chapter IV (Articles 35 to 51) started to apply (Art. 71(2)). Designation is still being completed across the Member States, so capacity — not paperwork — is the constraint: book EU-type examination or quality-system audit time against full application on 11 Dec 2027, 382 days away.
An Annex III Class I product keeps the notified body out only where harmonised standards, common specifications or a European cybersecurity certification scheme at assurance level at least ‘substantial’ covering the essential requirements concerned are applied in full (Art. 32(2)). No harmonised standard reference has been published in the Official Journal and no common specification has been adopted, so the only route out of a third-party assessment today is a European cybersecurity certificate at that level, under a scheme specified by delegated act pursuant to Art. 27(9). Designation status here is dated to regulation library 2026.09; check the Commission’s public list of bodies notified under this Regulation (NANDO) before you plan against it.
Open items across products
- Annex I requirements addressed (9/22) · NW-200 Edge Controller
- Annex I requirements addressed (4/22) · NW-Link Industrial Router
- Annex I requirements addressed (0/22) · Northwind Insight App
- Technical documentation compiled (Annex VII) · NW-Link Industrial Router
- Technical documentation compiled (Annex VII) · Northwind Insight App
- SBOM imported and completely scanned within the last 24 hours · NW-200 Edge Controller
- SBOM imported and completely scanned within the last 24 hours · NW-Link Industrial Router
- SBOM imported and completely scanned within the last 24 hours · Northwind Insight App
- Complete a current SBOM scan before assessing the absence of critical or exploited findings · NW-200 Edge Controller
- Complete a current SBOM scan before assessing the absence of critical or exploited findings · NW-Link Industrial Router
Regulation library 2026.09 · baseline September 2026 · Organise product evidence, documentation and next steps · Terms